Royal Bank of Scotland PlcThe Forest project involved upgrading the Group Risk Data Warehouse to handle increased data loads after the merger with the National Westminster Bank. Upgraded various data feeds to fit the new data architecture. This included building new unit test modules (for which I designed and built a unit test generator which was used throughout the project) and updating the technical specifications. Wrote test specification documentation and built generic scripts for use in integration testing. Performed integration tests on various data feeds and applications of the new warehouse. Hardware Used
|